Portable vulcanizer(spot vulcanizer)
CGXBJ (high voltage) parameter sheet
CGXBJ (high voltage) parameter sheet
Model | XBPJ-1 | XBPJ-2 | XBJ-3 |
Types of repairing transport belt | Canvas, nylon, Belt with wire rope for transporting | Canvas, nylon, Belt with wire rope for transporting | Canvas, nylon, Belt with wire rope for transporting |
Repair transport belt width (mm) | 650—2200 | 650—2200 | 650—2200 |
The maximum cut size of repairing belt (mm) | 250×250 | 250×600 | 250×900 |
Electric heating-Dimension (mm) | 350×350 | 350×700 | 350×1000 |
Vulcanizing temperature as Repairing at 145 ℃ | Adjustable 0-200 ℃ | Adjustable 0-200 ℃ | Adjustable 0-200 ℃ |
Total power (Kw) | 1.91 | 1.91 | 1.91 |
Voltage (V) | 380 | 380 | 380 |
Temperature difference of working Electrical plate surface (℃) | ±3 | ±3 | ±3 |
Sulfide pressure (MPa) | 0.8 | 0.8 | 0.8 |
Time of heating from normal temperature to curing temperature (mins) | 30 | 30 | 30 |
Installation:
1.Please move the repair machine to the repair location;
2.Please fill the raw rubber to the broken part. (The filling raw rubber part in the vulcanization technics can be taken as reference, or our technical workers demonstrate it as adjusting.)
3. Please put the down machine frame rightly aiming at the broken part, meanwhile, put the hydraulic pressure plate and the lower heating plate under the broken part.
4.Please put the upper heating plate on the broken part, and lay up the heat insulation plate, and then install the machine frame.( ※remark: CGXBJ low voltage series machines are integrative machines.
5.Install the screw and screw down.
6.Please connect power with electrical control box by primary cable, and separately connect upper heating plate with electrical control box, and the lower heating plate with electrical control box by secondary cable, meanwhile, please separately connect upper heating plate and electrical control box, lower heating plate and electrical control box with temperature-measure components. Please pay attention to the corresponding electrical control box as connection. 7.Please connect hydraulic plate and pressure-test pump with high pressure tube, and then start the electrical control box, meanwhile, and affuse water to the condition of vulcanizing pressure.